  Project List

Facilities Management


     


Service Request

 

 

 

Facilities Management
Project List

Listed By Building, by fiscal year

For Fiscal Years 2008-2009-2010- and "Beyond"

 

 

 

Important Note:  Proposed Schedule is Tentative and Will Change
 

Please see our Project Selection Criteria to learn more about how the Project List is created

 

Large Capital Projects Highlighted in Green

 

 

 

Building

Description

 Schedule

102 Conway

Install sidewalk to rear apartment.

Beyond

135 N.College

Pave driveway behind Women's Center.

Beyond

170 W. Louther

Install sprinklers

09

170 W. Louther

Install security screens

Beyond

243 W. Louther

Renovate bedrooms and bathrooms

09

243 W. Louther

Restore brick exterior

Beyond

33 Conway

General maintenance upgrades

09

34  S. West

Install Sprinklers

08

417-425 W. Louther

Pave driveways

Beyond

448 W. High

Upgrade exterior, steps, rails, porch

09

49/51 S.College

Repair rear foyer area and kitchen, 51 side

09

5 N. Orange

Modify east end roof, gutters

08

5 N. Orange

Install print services department within 5 N. Orange office area

08

5 N. Orange

Install garage door in carpenter shop

Beyond

5 N. Orange

Paint the exterior of the building

Beyond

5 N. Orange

Install roof for trash truck and bucket truck

Beyond

5 N. Orange

Install screening along High Street fence

Beyond

5 N. Orange

Pave Facilities parking lot, install speed bumps

Beyond

50 Mooreland

Replace sewer line

09

50 Mooreland

Install new elevator

Beyond

50 Mooreland

Install handicap ramp

Beyond

50 Mooreland

Increase parking lot

Beyond

50 Mooreland

Install drive to parking lot from Mooreland Ave.

Beyond

57 S. College

Repaint roof

09

61 N. West

Replace roof with Eco-Star slate

09

Adams

Pave alley and install curbing behind Adams

Beyond

Admissions

Renovate balcony, phase I

09

Admissions

Convert fireplaces to vented gas

09

Althouse Renovate for new program
08-09

Asbell

Make repairs to exterior facade - dryvit areas

09

ATS

Upgrade stairwells

09

ATS

Modify drive to increase parking

Beyond

ATS

Clean and water proof exterior concrete

Beyond

ATS

Improve exterior appearance with architectural paneling system

Beyond

ATS

Re-orient seating to improve sightlines

Beyond

Biddle Field

Repoint brick and repair and paint stands

09

Biddle Field

Improve exterior sidewalks outside of the fence

09

Biddle Field

Replace fence

09

Biddle Field

Install a new 8 lane track & synthetic turf field

09

Biddle Field

Tennis court upgrades

Beyond

Biddle Field

Extend special paving to the track

Beyond

Biddle Field

Install addition to weight room

Beyond

Biddle Field

Install a laundry

Beyond

Biddle Field

Install a new game lighting system

Beyond

Biddle House

Upgrade College Street entry

08

Bookstore

Upgrades to the bookstore

Beyond

Bosler

Replace top floor hall carpet and misc. classrooms

08

Bosler

Replace faculty lounge carpet

08

Bosler

Upgrade lighting system in the lobby area

09

Bosler

Improve heating and cooling systems

09

Bosler

Commission a building-wide modernization study

09

Bosler

Install protection over bike racks

09

Bosler

Upgrade Tech Services area, add more offices

09

Bosler

Install security camera in computer lab

Beyond

Bosler

Install roof over west side entry ramp

Beyond

Bosler

Utilize attic space

Beyond

Bosler

General upgrades to lobby area

Beyond

Campus

Remove unnecessary overhead wires, (Scott Apartments, 170 WL)

08

Campus

Upgrade the campus master plan

08-09

Campus

Install additional emergency phone stations "blue phones"

08-09

Campus

Upgrade exterior ADA signage, phase II

08-09

Campus

Install Excellerator hand dryers in public buildings

08-09

Campus

Upgrade walk between Montgomery and Hub, install tables

09

Campus

Upgrade exterior lighting of signage, architecture

09

Campus

Install improved signage on campus buildings

09

Campus

Preventative maintenance on campus high voltage systems

09

Campus

Create new campus plaza area at West and High Streets

09

Campus

Upgrade exterior lighting to new fixtures, in phases

09

Campus

High Street Improvements - reducing lanes, landscaping, etc.

09

Campus

Install baby changing stations in public buildings

Beyond

Campus

Landscape corner of Cherry and High Streets

Beyond

Campus

Install a walkway along the tennis court alley

Beyond

Campus

Install web cams in dining and fitness

Beyond

Campus

Install lightening protection on tall campus trees, phase II

Beyond

Campus

Install new walks from East College to Althouse

Beyond

Campus

Upgrade lights on Rush Campus, Ph III

Beyond

Campus

Complete Dickinson Walk

Beyond

Campus

Install new dance studio space

Beyond

Carriage House

Replace windows

09

Children's Center

Carpet hallways       

08

Children's Center

Replace floor surfacing

08

Children's Center

Upgrade big west room with climbing equip.

09

Children's Center

Pave East lot and stripe

Beyond

Cubiculo

Install work lights

09

Dana

Renovate lab 205-Mike Roberts Office-lab

Beyond

Dana

Install countertop room 202

Beyond

Dana

Renovate lab room 220

Beyond

Dana Renovate after last phase of New Science Building
Beyond

Dance Studio

Install sprung floor, men's dressing room, and heighten ceiling

Beyond

Denny

Replace windows

09-10

Denny

Create student/faculty lounge

Beyond

Depot

Install pull down gate on DJ booth

09

Depot

Install water fountain

Beyond

Dickinson Park

Upgrade/standardize signage for facility

Beyond

Dickinson Park

Upgrade the jogging trail

Beyond

Dickinson Park

Light the jogging trail

Beyond

Dining Services

Repair kitchen floor tiles

08

Dining Services

Upgrade serving line area, lights, signs, etc.

09

Dining Services

Replace oven, deep fryers, mixer in bake shop

Beyond

East College

Carpet hallways and classrooms, in phases

08-09

East College

Install torsion flex chairs -- misc. classrooms

08-09

East College

Replace ceilings and light fixtures -- misc. classrooms

09

Financial Aid

Install handicap ramp on South entry

Beyond

Goodyear

Repair main entry steps and landing

08

Goodyear

Install Ceramics Studio

08

Goodyear

Upgrade for accessibility

Beyond

Goodyear

Install slats in fence, parking lot side

Beyond

Goodyear

Repair or remove skylights

Beyond

Goodyear

Create studio on 2nd floor for archaeology cast collection

Beyond

Goodyear

Extend bedroom walls

Beyond

Harvest House

Renovate or build a Harvest House residence hall

Beyond

Heating Plant

Remove boilers - modify building - install switchgear

09

HUB

Replace or re-clad doors on floor one in hallways

08

HUB

Install heat tape over food service dock

08

HUB

Replace rubber roof areas as required by priority

08-09

HUB

Upgrades to Res. Life Offices - new office for Dean, etc.

08-09

HUB

Upgrades to lower level hallways

09

HUB

Upgrades to Siderooms and bathrooms

09

HUB

Upgrade Union Station Finishes and repair/replace skylight

09

HUB

Install lights for lower plaza

09

HUB

Landscape North side of HUB

09

HUB

Replace air handling units

09-10

HUB

East entry upgrades, including moving gate across College St.

Beyond

Kline Center

Build back to back display cases for hall of fame area

08

Kline Center

Racquetball courts: repair dead spots in walls

09

Kline Center

Pool: remove diving platform, repair tile, add central board

09

Kline Center

Replace entry steps, entry ramp, entry doors

09

Kline Center

Roof repairs and replacement - in phases

09-10

Kline Center

Install new speaker system

Beyond

Kline Center

New lockers in men's and women's locker rooms

Beyond

Kline Center

Modify system with cooling coil for main floor

Beyond

KW

Exterior paint

09

KW

Install architectural panels on exterior

Beyond

Malcom

Repair floor tiles as required

09

Malcolm

Upgrade landscaping at building entry

Beyond

Malcolm

Install hall carpet

Beyond

Mather's Theatre

Repair stage at deck joint

08