Facilities Management
Project List
|
Listed By Building, by fiscal year |
For Fiscal Years 2008-2009-2010- and "Beyond" |
|
|
|
Important Note: Proposed Schedule is Tentative and Will Change |
| |
Please see our Project Selection Criteria to learn more about how the Project List is created |
|
Large Capital Projects Highlighted in Green |
|
|
|
Building |
Description |
Schedule |
102 Conway |
Install sidewalk to rear apartment. |
Beyond |
135 N.College |
Pave driveway behind Women's Center. |
Beyond |
170 W. Louther |
Install sprinklers |
09 |
170 W. Louther |
Install security screens |
Beyond |
243 W. Louther |
Renovate bedrooms and bathrooms |
09 |
243 W. Louther |
Restore brick exterior |
Beyond |
33 Conway |
General maintenance upgrades |
09 |
34 S. West |
Install Sprinklers |
08 |
417-425 W. Louther |
Pave driveways |
Beyond |
448 W. High |
Upgrade exterior, steps, rails, porch |
09 |
49/51 S.College |
Repair rear foyer area and kitchen, 51 side |
09 |
5 N. Orange |
Modify east end roof, gutters |
08 |
5 N. Orange |
Install print services department within 5 N. Orange office area |
08 |
5 N. Orange |
Install garage door in carpenter shop |
Beyond |
5 N. Orange |
Paint the exterior of the building |
Beyond |
5 N. Orange |
Install roof for trash truck and bucket truck |
Beyond |
5 N. Orange |
Install screening along High Street fence |
Beyond |
5 N. Orange |
Pave Facilities parking lot, install speed bumps |
Beyond |
50 Mooreland |
Replace sewer line |
09 |
50 Mooreland |
Install new elevator |
Beyond |
50 Mooreland |
Install handicap ramp |
Beyond |
50 Mooreland |
Increase parking lot |
Beyond |
50 Mooreland |
Install drive to parking lot from Mooreland Ave. |
Beyond |
57 S. College |
Repaint roof |
09 |
61 N. West |
Replace roof with Eco-Star slate |
09 |
Adams |
Pave alley and install curbing behind Adams |
Beyond |
Admissions |
Renovate balcony, phase I |
09 |
Admissions |
Convert fireplaces to vented gas |
09 |
| Althouse |
Renovate for new program |
08-09 |
Asbell |
Make repairs to exterior facade - dryvit areas |
09 |
ATS |
Upgrade stairwells |
09 |
ATS |
Modify drive to increase parking |
Beyond |
ATS |
Clean and water proof exterior concrete |
Beyond |
ATS |
Improve exterior appearance with architectural paneling system |
Beyond |
ATS |
Re-orient seating to improve sightlines |
Beyond |
Biddle Field |
Repoint brick and repair and paint stands |
09 |
Biddle Field |
Improve exterior sidewalks outside of the fence |
09 |
Biddle Field |
Replace fence |
09 |
Biddle Field |
Install a new 8 lane track & synthetic turf field |
09 |
Biddle Field |
Tennis court upgrades |
Beyond |
Biddle Field |
Extend special paving to the track |
Beyond |
Biddle Field |
Install addition to weight room |
Beyond |
Biddle Field |
Install a laundry |
Beyond |
Biddle Field |
Install a new game lighting system |
Beyond |
Biddle House |
Upgrade College Street entry |
08 |
Bookstore |
Upgrades to the bookstore |
Beyond |
Bosler |
Replace top floor hall carpet and misc. classrooms |
08 |
Bosler |
Replace faculty lounge carpet |
08 |
Bosler |
Upgrade lighting system in the lobby area |
09 |
Bosler |
Improve heating and cooling systems |
09 |
Bosler |
Commission a building-wide modernization study |
09 |
Bosler |
Install protection over bike racks |
09 |
Bosler |
Upgrade Tech Services area, add more offices |
09 |
Bosler |
Install security camera in computer lab |
Beyond |
Bosler |
Install roof over west side entry ramp |
Beyond |
Bosler |
Utilize attic space |
Beyond |
Bosler |
General upgrades to lobby area |
Beyond |
Campus |
Remove unnecessary overhead wires, (Scott Apartments, 170 WL) |
08 |
Campus |
Upgrade the campus master plan |
08-09 |
Campus |
Install additional emergency phone stations "blue phones" |
08-09 |
Campus |
Upgrade exterior ADA signage, phase II |
08-09 |
Campus |
Install Excellerator hand dryers in public buildings |
08-09 |
Campus |
Upgrade walk between Montgomery and Hub, install tables |
09 |
Campus |
Upgrade exterior lighting of signage, architecture |
09 |
Campus |
Install improved signage on campus buildings |
09 |
Campus |
Preventative maintenance on campus high voltage systems |
09 |
Campus |
Create new campus plaza area at West and High Streets |
09 |
Campus |
Upgrade exterior lighting to new fixtures, in phases |
09 |
Campus |
High Street Improvements - reducing lanes, landscaping, etc. |
09 |
Campus |
Install baby changing stations in public buildings |
Beyond |
Campus |
Landscape corner of Cherry and High Streets |
Beyond |
Campus |
Install a walkway along the tennis court alley |
Beyond |
Campus |
Install web cams in dining and fitness |
Beyond |
Campus |
Install lightening protection on tall campus trees, phase II |
Beyond |
Campus |
Install new walks from East College to Althouse |
Beyond |
Campus |
Upgrade lights on Rush Campus, Ph III |
Beyond |
Campus |
Complete Dickinson Walk |
Beyond |
Campus |
Install new dance studio space |
Beyond |
Carriage House |
Replace windows |
09 |
Children's Center |
Carpet hallways |
08 |
Children's Center |
Replace floor surfacing |
08 |
Children's Center |
Upgrade big west room with climbing equip. |
09 |
Children's Center |
Pave East lot and stripe |
Beyond |
Cubiculo |
Install work lights |
09 |
Dana |
Renovate lab 205-Mike Roberts Office-lab |
Beyond |
Dana |
Install countertop room 202 |
Beyond |
Dana |
Renovate lab room 220 |
Beyond |
| Dana |
Renovate after last phase of New Science Building |
Beyond |
Dance Studio |
Install sprung floor, men's dressing room, and heighten ceiling |
Beyond |
Denny |
Replace windows |
09-10 |
Denny |
Create student/faculty lounge |
Beyond |
Depot |
Install pull down gate on DJ booth |
09 |
Depot |
Install water fountain |
Beyond |
Dickinson Park |
Upgrade/standardize signage for facility |
Beyond |
Dickinson Park |
Upgrade the jogging trail |
Beyond |
Dickinson Park |
Light the jogging trail |
Beyond |
Dining Services |
Repair kitchen floor tiles |
08 |
Dining Services |
Upgrade serving line area, lights, signs, etc. |
09 |
Dining Services |
Replace oven, deep fryers, mixer in bake shop |
Beyond |
East College |
Carpet hallways and classrooms, in phases |
08-09 |
East College |
Install torsion flex chairs -- misc. classrooms |
08-09 |
East College |
Replace ceilings and light fixtures -- misc. classrooms |
09 |
Financial Aid |
Install handicap ramp on South entry |
Beyond |
Goodyear |
Repair main entry steps and landing |
08 |
Goodyear |
Install Ceramics Studio |
08 |
Goodyear |
Upgrade for accessibility |
Beyond |
Goodyear |
Install slats in fence, parking lot side |
Beyond |
Goodyear |
Repair or remove skylights |
Beyond |
Goodyear |
Create studio on 2nd floor for archaeology cast collection |
Beyond |
Goodyear |
Extend bedroom walls |
Beyond |
Harvest House |
Renovate or build a Harvest House residence hall |
Beyond |
Heating Plant |
Remove boilers - modify building - install switchgear |
09 |
HUB |
Replace or re-clad doors on floor one in hallways |
08 |
HUB |
Install heat tape over food service dock |
08 |
HUB |
Replace rubber roof areas as required by priority |
08-09 |
HUB |
Upgrades to Res. Life Offices - new office for Dean, etc. |
08-09 |
HUB |
Upgrades to lower level hallways |
09 |
HUB |
Upgrades to Siderooms and bathrooms |
09 |
HUB |
Upgrade Union Station Finishes and repair/replace skylight |
09 |
HUB |
Install lights for lower plaza |
09 |
HUB |
Landscape North side of HUB |
09 |
HUB |
Replace air handling units |
09-10 |
HUB |
East entry upgrades, including moving gate across College St. |
Beyond |
Kline Center |
Build back to back display cases for hall of fame area |
08 |
Kline Center |
Racquetball courts: repair dead spots in walls |
09 |
Kline Center |
Pool: remove diving platform, repair tile, add central board |
09 |
Kline Center |
Replace entry steps, entry ramp, entry doors |
09 |
Kline Center |
Roof repairs and replacement - in phases |
09-10 |
Kline Center |
Install new speaker system |
Beyond |
Kline Center |
New lockers in men's and women's locker rooms |
Beyond |
Kline Center |
Modify system with cooling coil for main floor |
Beyond |
KW |
Exterior paint |
09 |
KW |
Install architectural panels on exterior |
Beyond |
Malcom |
Repair floor tiles as required |
09 |
Malcolm |
Upgrade landscaping at building entry |
Beyond |
Malcolm |
Install hall carpet |
Beyond |
Mather's Theatre |
Repair stage at deck joint |
08 |
|