Building
|
Description of Work
|
Fiscal Year
|
| 103 Conway |
Install sidewalk to rear apartment |
2013 |
| 163 - 165 W. High |
Rewire |
2014 |
| 170 W. Louther |
Rewire |
2014 |
| 171 W. High |
Rewire and hardwire fire alarm |
2013 |
| 171 W.High |
Replace 3rd floor windows |
2012 |
| 171 W.High |
Replace carpet in stairways and hall |
2012 |
| 171 W.High |
Replace galvanized water lines |
2014 |
| 171-179 W. Louther |
Replace walks |
2014 |
| 50 Mooreland |
Install handicap ramp and lights |
2013 |
| 50
Mooreland |
Install new elevator |
2014 |
| 505-531 W. Louther |
Upgrade for fire alarms |
2012 |
| 51 South College |
Replace gas furnace with new high eff. HVAC system |
2012 |
| 57 S. College |
Rewire and hardwire fire alarm |
2014 |
| Adams |
Replace windows and window sills |
2014 |
| Adams |
Sealcoat parking lot |
2014 |
| Adams |
Redo bathrooms |
2014 |
| Alumni Commons Lot |
Sealcoat parking lot |
2014 |
| Asbell |
Make repairs to exterior facade - dryvit areas and
chimney |
2012 |
| ATS |
Replace south lobby carpet |
2012 |
| ATS |
Upgrade stairwells |
2012 |
| ATS |
Replace windows |
2012 |
| ATS |
Modify drive to develop more maintenance only parking |
2012 |
| ATS |
Clean and water proof exterior concrete |
2014 |
| Biddle House |
Upgrade College Street entry |
2012 |
| Boiling Springs Cottage |
Replace furnace |
2013 |
| Bosler |
Replace hall and classroom carpet, priority areas |
2012 |
| Bosler |
Improve lighting in atrium |
2013 |
| Bosler |
Re-carpet or refinish wood in first floor faculty lounge |
2013 |
| Buchannon |
Install Sprinkler Systems |
2013 |
| Campus |
Replace all DF Keys with new system |
2012 |
| Campus |
Clean exterior concrete masonry - fascia, walls, etc. |
2012 |
| Campus |
Install more indoor recycling and trash centers |
2012 |
| Campus |
Install campus bike racks and covered bike racks |
2012 |
| Campus |
Upgrade exterior ADA signage |
2013 |
| Campus |
Complete new signage on main buildings and res halls phase I |
2013 |
| Campus |
Upgrade exterior lighting of signage, architecture phase I |
2013 |
| Campus |
Complete new signage on main buildings and res halls phase II |
2014 |
| Campus |
Upgrade exterior lighting of signage, architecture Phase II |
2014 |
| Campus |
Replace concrete flower pots |
2014 |
| Campus |
Install card access system,
phased installations: complete academic buildings |
2012 |
| Campus |
Repair granite pavers at College and Louther |
2013 |
| Campus |
Replace curbs along High, Mooreland and College |
2014 |
| Campus |
Landscape corner of Cherry and High |
2014 |
| Central
Energy Plant |
Continuing Expansion to Bosler |
2012 |
| Conway |
Install sprinkler systems |
2014 |
| Cooper |
Install sprinkler systems |
2013 |
| Denny |
Replace windows, Phase IV |
2012 |
| Denny |
Replace windows, Phase V |
2013 |
| Depot |
Replace handicap sidewalk at delivery entrance |
2013 |
| Drayer |
Replace windows |
2013 |
| East College |
Reset flagstone entry and stairs |
2012 |
| Facilities Mngmnt |
Paint building exterior |
2014 |
| Facilities Mngmnt |
Install screening along High Street fence |
2014 |
| Financial Aid |
Install a handicap ramp on south entry |
2013 |
| Goodyear |
Upgrade Art Studio entry, install lift |
2013 |
| Goodyear |
Install slats in fence, parking lot side |
2014 |
| Goodyear |
Sealcoat parking lot |
2014 |
| Hartmen House |
Renovate common areas |
2012 |
| Health Center |
Replace carpet throughout |
2013 |
| HUB |
Upgrade AHUS - phased |
2012 |
| John
Dickinson Campus |
Ugrade hardscapes; Phase I |
2013 |
| Kaufman
Hall |
Complete roof repairs (A
section) |
2012 |
| Kline Center |
Replace concourse carpeting |
2012 |
| Kline
Center |
Roof repairs, Phase IV |
2012 |
| Kline
Center |
Roof repairs, Phase V |
2013 |
| KW |
Replace KW transformer/connect
McKenny |
2012 |
| Landis House |
Install handicap ramp; misc upgrades |
2012 |
| Longsdorff |
Install sprinkler systems |
2014 |
| Mathews |
Fire dectection upgrades |
2012 |
| Mathews |
Wood floor refinish |
2012 |
| McKenney |
Install new window treatments in lounges |
2012 |
| President's
House |
Upgrade ADA access |
2014 |
| President's House |
Sealcoat drive |
2014 |
| Quads |
Install new lights in restrooms |
2014 |
| Quarry |
Replace basement windows |
2012 |
| Quarry |
Replace roof and windows |
2014 |
| Reed
Hall |
Upgrades Phase II (bathrooms) |
2012 |
| Reed/Cherry |
Put all exterior lights on one photo cell |
2014 |
| Residence Halls |
Install security screens, phase I |
2014 |
| Residence
Halls |
Entry way and hallway upgrades
in large halls; Phase I |
2012 |
| Scott Apts |
Reconfigure parking lot |
2013 |
| Small
House |
Renovate kitchens |
2014 |
| South College |
Renovate first floor bathrooms |
2013 |
| South College |
Overlay parking lot |
2014 |
| Stern |
Replace flattened stair carpet |
2012 |
| Strayer |
Upgrade for accessibility |
2014 |
| Stuart
Hall |
Upgrades (HVAC, sprinklers,
lounges) |
2012 |
| Todd |
Install new HVAC System,
sprinkle, upgrade for accesability, repair porch wall |
2013 |
| Waidner Spahr |
Replace back doors & north side entrance |
2012 |
| Waidner
Spahr |
Repair, clean and waterproof
Spahr fascia |
2014 |
| Waidner-Spahr |
Repair ramp |
2012 |
| Waidner-Spahr |
Prioritize carpet replacements Phase I |
2012 |
| Waidner-Spahr |
Prioritize carpet replacements Phase II |
2013 |
| Weiss |
Reset steps |
2012 |
| Weiss |
Upgrade 3rd floor music rooms (paint/carpet) |
2012 |
| Weiss |
Operable windows in 212, 215, 217 |
2013 |
| Weiss |
Replace patio |
2013 |
| Weiss |
Renovations to Rubendahl |
2012 |
| Weiss |
Upgrade building access |
2014 |
| Weiss |
Install independent mechanical
system for cooling |
2014 |
| Witwer
Hall |
Replace floor tiles, install
sprinkler, bathroom upgrades |
2013 |